Commercial · Handover and punch list
For general contractors and owners with a handover date, a building full of dust, and a punch list that keeps reopening because the space was cleaned once instead of three times.
Get the clean planned in phases against your turnover date, before the date is the thing forcing the plan.
$500-$1,000 · Credited 100% against an awarded post-construction clean of $5,000+ · Delivered in 3 to 5 business days after the walkthrough.
The project has a handover date, the trades are not finished, and the final clean is still a line item nobody has scoped or scheduled.
General contractors, construction managers, developers, owners and property managers turning over commercial space, tenant fit-outs, multi-family units or renovated common areas.
Our walkthrough and proposal are free and always will be. A proposal prices a scope that already exists. This document is for when it does not, which is why competing bids on the same building come back nowhere near each other. You are paying for the walkthrough, the photographs and a specification you own.
The full report fee is credited against an awarded Divine Cleaning DMV post-construction clean of $5,000 or more, awarded within 45 days of delivery.
The deliverable is the Post-Construction Clean Scope & Turnover Plan. Delivered in 3 to 5 business days after the walkthrough.
Pick the tier that matches the property. If you are not sure, send the square footage first and we will tell you which one fits before you pay anything.
$500
One project up to 10,000 square feet
$1,000
10,001 to 40,000 square feet, or a multi-floor or multi-phase turnover
The full report fee is credited against an awarded Divine Cleaning DMV post-construction clean of $5,000 or more, awarded within 45 days of delivery.
Send the building details. We confirm the tier that fits, send an invoice and book the walkthrough. Nothing is charged until we have confirmed the document is right for your property.
Schedule a WalkthroughScope limitation: This document is a visual cleaning-planning report based on accessible conditions observed during the site walkthrough and information provided by the customer. It is not an engineering report, an industrial hygiene or indoor air quality assessment, a laboratory test, an insurance coverage determination, a code-compliance certification, or a guarantee that hidden conditions do not exist. Additional work may be required if concealed conditions are discovered after work begins.
No, and earlier is usually better. The plan is built backwards from your turnover date, so it is most useful while there is still schedule left to protect. We walk the space at whatever stage it is at and say plainly what has to be finished before each cleaning phase can start.
Yes, in full, against an awarded Divine Cleaning DMV post-construction clean of $5,000 or more, awarded within 45 days of delivery.
Because one clean at the end is the reason punch lists reopen. Dust settles after the trades leave, and a space cleaned once gets re-dirtied by the last two weeks of work. The phases are what make the final walk pass first time, and the plan prices each one separately so you can award them separately.
It is outside this scope and outside our work. If the walkthrough turns up something that needs a licensed abatement contractor, the plan says so and excludes it rather than pricing around it.
Multi-building projects, campuses and anything above 40,000 square feet are quoted individually. Send the project list and we will price it.
Schedule a walkthrough